1. To establish semiaxial gear wheels together with new adjusting linings with the thickness which has been picked up according to earlier measured backlashes. |
2. To establish satellites together with basic linings and an axis. |
3. To heat up a conducted gear wheel of the main transfer (by its lowering in hot water) and to put on it a differential box. |
4. To provide a normal centering by installation of four bolts of fastening. |
5. After adjustment of installation of gear wheels of the main transfer (subsection 8.3.6 see) to establish differential bearings. |